Motorola SG 2000 Betriebsanleitung Seite 43

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 53
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 42
Operation 5
55
5-
--
-7
77
7
AT&T SLW2500 Installation and Operation Manual
CAUTION!
CAUTION!
CAUTION!CAUTION!
CAUTION! Do not pull the optical connector out more than two inches from the casting wall. If you pull
the connector out too far, you must disassemble the module and respool the fiber.
7 To verify the position of the optical connector assembly, lift the metal tab and attempt to
remove the optical connector assembly from the module casting. The connector assembly
should slide out easily. If not, remove the sheet metal cover and verify the position of the
optical connector assembly. Release the metal tab and snap the optical connector assembly
back into place.
8 If necessary, re-install the SG2-LR in the node.
Return Path RF
The SG2-DFBT optical transmitter must be installed in the nodes optical transmitter B location.
The SLW25-RPLR must be installed in the A location. Figure 3-1 illustrates the correct location
for each module.
Figure 5-6
Typical return configuration
Return path
optical receiver
SLW25-RPLR
SG2-DFBT
optical
transmitter
TP
JXP
JXP
BASE
LID
JXP
TP
TP
H
L
RPLP
filter
Seitenansicht 42
1 2 ... 38 39 40 41 42 43 44 45 46 47 48 ... 52 53

Kommentare zu diesen Handbüchern

Keine Kommentare