Motorola SG4-DRT-2X Betriebsanleitung Seite 46

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 108
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 45
3-18 Bench Setup and Operation
SG4000 Installation and Operation Manual
26
Move the jumper on the EPIM board from the SW2 auto to the SW2 A position, thereby
disabling receiver 8. See Section 4, “Modules,” Embedded Plug-in Module for detailed
information on the switch and jumper settings.
27 Route the fiber service cable into the node and fiber tray.
28 Measure the optical input power on the primary and secondary forward pigtails, leaving
enough length to connect them to the receiver bulkhead connectors.
29 Apply power to the node (see Powering the Node in this section). Allow five to ten seconds
for the system self diagnostics to complete.
30 Connect the service cable to the primary and secondary receiver bulkhead connectors.
31 Verify that the green LED (ON), located on the top panel of the SG4-R/* in lid optics slot 7, is
illuminated to confirm enable status.
32 Using a voltmeter, test the optical input power to the receivers. Figure 4-2 illustrates the
optical power test point on the top panel of the SG4-R/* receiver.
The scaled voltage at this test point is 1.0 V/mW.
33 Using an RF meter, measure the RF output level at the primary receiver 20 dB test point.
For 0 dBm (1.0 mW) input, the receiver output level is approximately a flat 26 dBmV at
870 MHz. Other output levels are presented in Table 4-2.
34 Select a JXP-* pad from Table 2-2 and insert it into the receiver pad facility.
35 Check all 20 dB test points on SG4-RF modules on the right side of the node.
These SG4-RF modules are connected to the forward redundant segment 2X board in
forward configuration location 4.
36 Determine how much output (excess or shortage) is present at the port with the lowest level
and insert the necessary pad into the pad facility of receiver 7
37 If necessary, adjust level variances between output ports by placing a pad at the particular
output pad position.
38 Move the jumper on the EPIM board to the SW2 B override position, which turns receiver 7
off.
The red fault LED on receiver 7 and the green enable LED on receiver 8 should illuminate.
39 Repeat Steps 33 through 37 and verify that the node output levels are the same as the
primary receiver.
Adjust the secondary receiver output pad only; do not re-adjust any output padding in the
RF modules.
40 Move the jumper on the EPIM board back to the SW2 AUTO position.
Unbalanced padding can degrade isolation performance. Ensure that equivalent optical power
levels are present on each receiver if possible.
Seitenansicht 45
1 2 ... 41 42 43 44 45 46 47 48 49 50 51 ... 107 108

Kommentare zu diesen Handbüchern

Keine Kommentare