SG4000 Installation and Operation Manual
Section 3
Bench Setup and Operation
Before you install the SG4000, it must be set up to meet the power and configuration
requirements for each particular node location. This section presents the set up procedures that
are recommended to ensure proper functioning of all components and simplify field installation.
This section also provides information concerning the operation of the various options and
applications required by your system.
Figure 3-1 illustrates the SG4000 optical node indicating the location of major components in
the base.
Figure 3-1
SG4000 base and major components
SG4
Status monitor
Interconnect Cable
(SIC)
SG4-RF
module
SG4-RF
module
SG4-PS
power supplies
SG4
power distribution
board
SG4-RF
module
SG4-RF
module
SG4
Power
Interconnect Cable
(PIC)