Motorola DROID X2 - PRODUCT SAFETY AND WARRANTY INFORMATION Installationsanleitung

Stöbern Sie online oder laden Sie Installationsanleitung nach Mobiltelefone Motorola DROID X2 - PRODUCT SAFETY AND WARRANTY INFORMATION herunter. Motorola DROID X2 - PRODUCT SAFETY AND WARRANTY INFORMATION Installation guide Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 78
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
Installation
Guide
ChargePoint, Inc.
1692 Dell Ave.
Campbell, CA 95008-6901 USA
US toll free: +1-877-850-4562
www.chargepoint.com
Document P/N: 75-001084-02 Rev. 3
CT4000 Family
ChargePoint® Networked Charging Station
Seitenansicht 0
1 2 3 4 5 6 ... 77 78

Inhaltsverzeichnis

Seite 1 - CT4000 Family

Installation GuideChargePoint, Inc.1692 Dell Ave.Campbell, CA 95008-6901 USAUS toll free: +1-877-850-4562www.chargepoint.comDocument P/N: 75-001084-02

Seite 2

1-6ChargePoint® Charging StationsGrounding RequirementsThe voltage of either line, relative to ground, must not fall below 80 volts or a Floating Line

Seite 3

1 -7Introduction

Seite 4 - 5 Troubleshooting

1-8ChargePoint® Charging Stations

Seite 5

22-1Installing a Bollard MountBefore You StartBefore installing a bollard mount, prepare the installation site as described in Appendix A. After prepa

Seite 6 - Before Installing

2-2ChargePoint® Charging StationsStep 1: Check Boxes for Correct ContentsThe bollard mount ships in two boxes as described below.Main Body• Main body

Seite 7 - Specifications

2-3Installing a Bollard MountStep 2: Prepare Pole/Base Plate for Mounting• Use a 3/8” socket wrench to loosen (but not remove) the two screws holding

Seite 8 - Dual Circuit Wiring Diagram

2-4ChargePoint® Charging StationsPosition a level at various locations, both horizontally and vertically, including over each boltAlign the longer cur

Seite 9

2-5Installing a Bollard MountStep 4: Install Main BodyTo install the main body:• Align the notches on the rubber spacer with the front mounting nuts,

Seite 10 - Grounding Requirements

2-6ChargePoint® Charging StationsStep 5: Prepare Retractor for MountingTo prepare the retractor for mounting:• Position the retractor packaging so th

Seite 11 - Introduction

2-7Installing a Bollard MountStep 6: Install RetractorTo install the retractor:• Insert the black cap into the space at the top of the main body, bet

Seite 12

SAVE THESE IMPORTANT SAFETY INSTRUCTIONSThis manual contains important instructions that must be followed during installation of a ChargePoint® Networ

Seite 13 - Installing a Bollard Mount

2-8ChargePoint® Charging StationsStep 7: Connect WiringIMPORTANT: To power a dual-port station using a single 40A circuit, use the Power Share option

Seite 14 - Cable Management Kit

2-9Installing a Bollard MountStep 8: Check Voltages• Turn power ON.• Using a solenoid type voltage tester, check that the voltages at the charging s

Seite 15

2-10ChargePoint® Charging StationsOPTIONAL: Apply custom signs to the front of the bollard and/or the back of the retractor. See Appendix C. You have

Seite 16 - Step 3: Mount Pole/Base Plate

33-1Installing a Wall MountBefore You StartYou need the following:• Drill and Tap for appropriate wall attachment hardware• Attachment hardware, suc

Seite 17 - Step 4: Install Main Body

3-2ChargePoint® Charging StationsStep 1: Check Boxes for Correct ContentsThe wall mount ships in two boxes as described below.Main Body and Mounting K

Seite 18

3-3Installing a Wall MountStep 2: Drill Holes in Wall• The packing box for the brackets is used as a template for drilling the wall holes. Tear the p

Seite 19 - Step 6: Install Retractor

3-4ChargePoint® Charging StationsStep 3: Mount Rear Brackets to WallSeparate the pre-assembled front and rear brackets by loosening (but not removing)

Seite 20 - Step 7: Connect Wiring

3-5Installing a Wall MountStep 4: Prepare Retractor for MountingTo prepare the retractor for mounting:• Position the retractor packaging so that the

Seite 21 - Step 8: Check Voltages

3-6ChargePoint® Charging StationsStep 5: Mount RetractorTo mount the retractor assembly:• Place the two front brackets where you can easily reach the

Seite 22

3-7Installing a Wall MountStep 6: Install ConduitAs shown, the base of the main body has two conduit knockouts: 1” and ¾” (25 mm and 19 mm). Using a fl

Seite 23 - Installing a Wall Mount

iContents1 IntroductionSummary of Shipping Boxes ...1-1Installation Sequence ...

Seite 24 - Contents

3-8ChargePoint® Charging StationsStep 7: Install Main Body• Expose the pre-drilled hole located below the terminal block. To do so, push the tab on t

Seite 25 - Step 2: Drill Holes in Wall

3-9Installing a Wall MountStep 8: Connect WiringIMPORTANT: To power a dual-port station using a single 40A circuit, use the Power Share option provide

Seite 26

3-10ChargePoint® Charging StationsStep 9: Check Voltages• Turn power ON.• Using a solenoid type voltage tester, check that the voltages at the charg

Seite 27

3-11Installing a Wall MountYou have now finished installing the wall mount and are ready to install the head assembly and top cap. See Chapter 4.

Seite 29 - Step 6: Install Conduit

44-1Installing the Head and Top CapBefore You StartBefore installing the head and top cap, you must complete the installation of the main body and its

Seite 30 - Step 7: Install Main Body

4-2ChargePoint® Charging StationsStep 1: Check Boxes for Correct ContentsTop capThe station’s top cap ships in a box containing:• Top cap (1)• Phill

Seite 31 - Step 8: Connect Wiring

4-3Installing the Head and Top CapStep 1 cont’d: Check Boxes for Correct ContentsHead assemblyThe station’s head assembly ships in a box containing:•

Seite 32 - Step 9: Check Voltages

4-4ChargePoint® Charging StationsStep 2: Prepare Head Assembly for Mounting• To prepare the head assembly for mounting, open the box and stand the he

Seite 33

4-5Installing the Head and Top CapStep 2 cont’d: Prepare Head Assembly for Mounting• Install the top cap. There are two types of top caps: - SNAP T

Seite 34

ii4 Installing the Head and Top CapBefore You Start ... 4-1Overview of Steps ...

Seite 35 - Overview of Steps

4-6ChargePoint® Charging StationsTO INSTALL A SCREW TYPE TOP CAP (to install a snap type top cap, see the previous page) a) Place the top cap over the

Seite 36

4-7Installing the Head and Top CapStep 3: Slide Head Assembly Into BodySlide the head assembly into the main body until it is stopped by the head asse

Seite 37 - Head assembly

4-8ChargePoint® Charging StationsStep 4: Connect Head AssemblyIMPORTANT: If configuring a dual station to operate from only one circuit, or to operate

Seite 38 - Remove the SIM card

4-9Installing the Head and Top CapStep 5: Use the Wizard to Complete the InstallationPower up the station to run the onscreen Installation Wizard, whi

Seite 39

4-10ChargePoint® Charging StationsThe CT4000 Installation Wizard also includes a procedure for replacing a broken head assembly, which includes these

Seite 40

4-11Installing the Head and Top CapNOTE - POWER MANAGEMENT KIT If you are using Power Sharing to allow both ports on a dual port station to share a si

Seite 41

4-12ChargePoint® Charging StationsStep 6: Secure Head AssemblyRemove the L-wrench by rotating it to the right until the security tag breaks. Lift the

Seite 42 - Step 4: Connect Head Assembly

4-13Installing the Head and Top CapStep 7: Prepare the Station for Activation on ChargePointBefore leaving the installation site, you must prepare the

Seite 43

4-14ChargePoint® Charging StationsTHIS PAGE IS INTENTIONALLY BLANK

Seite 44

4-15Installing the Head and Top CapDocument the Radio GroupsFor each radio group, attach spare activation labels below to document how stations are or

Seite 45 - STARTING A CHARGING SESSION

11-1IntroductionThis document provides step-by-step instructions on how to install a CT4000 ChargePoint® Charging Station. Summary of Shipping BoxesAs

Seite 46 - Step 6: Secure Head Assembly

4-16ChargePoint® Charging StationsPost-Installation ChecklistBefore leaving the installation site, complete this checklist for each radio group. Then

Seite 47

55-1TroubleshootingCheck the Station’s DisplayWhen the station is powered on and the Installation Wizard has been completed, you should see:• The ins

Seite 48

5-2ChargePoint® Charging StationsDescription of Station CodesCode Symptom Possible cause(s) Recommended Action(s)In most cases, a driver can resolve t

Seite 49 - Document the Radio Groups

5-3TroubleshootingCode Symptom Possible cause(s) Recommended Action(s)205-UNS Before activation:The banner between the port icons displays“NETWORK SIG

Seite 50 - Post-Installation Checklist

5-4ChargePoint® Charging StationsCode Symptom Possible cause(s) Recommended Action(s)ChargePoint Support may need to resolve the following station cod

Seite 51 - Troubleshooting

5-5TroubleshootingCharging Cable Doesn’t Move FreelyIf the charging cable does not extend or retract fully and smoothly, it is likely that it’s rope h

Seite 52 - Description of Station Codes

5-6ChargePoint® Charging Stations4. Inspect the rope to ensure it is properly aligned onto the pulley. 5. Carefully lower the weight back into the r

Seite 53

A-1APreparing the Installation Site for a Bollard MountBefore You StartThe ChargePoint® Charging Station’s bollard mount can be installed either:• in

Seite 54

A-2ChargePoint® Charging StationsCasting into New ConcreteBefore casting into new concrete, review the site for suitability to install a CT4000. The C

Seite 55 - Follow these steps:

A-3 Installing on Existing ConcreteIf installing on existing concrete, perform the following tasks:• Review the site for suitability to install a CT4

Seite 56 - Ensure the rope is properly

1-2ChargePoint® Charging StationsInstallation SequenceRegardless of the specific type of CT4000 charging station you are installing, and the options in

Seite 57 - Installation Overview

A-4ChargePoint® Charging Stations24” (600 mm)3” (75 mm)6”(150 mm)Follow These Steps1. Install two nuts with two washers captured between them. Lock t

Seite 58 - Casting into New Concrete

BB-1CT4000 Power Management InstructionsAs shipped, a CT4000 charging station provides up to 30A of output power to each charging port. The Power Mana

Seite 59

B-2ChargePoint® Charging StationsPower Share - Overview of Steps 1. Install jumpers and connect the wiring 2. Apply the Electrical Rating label 3.

Seite 60 - (150 mm)

B-3 Lift the white lever on the terminal block that corresponds with the ground connection (center), insert the ground wire, then push the lever down

Seite 61 - Kit Contents

B-4ChargePoint® Charging StationsPower Select - Overview of Steps 1. Configure Power Select 2. Apply the Electrical Rating label Power Select - Step

Seite 62 - 1/2” (13 mm)

B-5 For 16A Circuits For 24A CircuitsIf both ports are sharing a single circuit (and you have therefore installed the jumpers), you must use the power

Seite 64 - Step 1: Configure Power Select

CC-1Installing and Replacing SignsFollow these steps in this section to install signs onto the charging station. To ensure a proper fit, signs must fol

Seite 65

C-2ChargePoint® Charging StationsInstalling a Top Sign on the RetractorTo remove a sign after the station has been installed:1. Use the L-wrench to l

Seite 66

C-3 Installing a Bottom Sign on the Wall Mount RetractorTo ensure a proper fit, the bottom sign must have these minimum characteristics: • Material -

Seite 67

1 -3IntroductionSpecificationsElectrical Input SINGLE PORT DUAL PORTAC Voltage 208/240VAC 208/240VACCurrent Input Power ConnectionRequired Service Pane

Seite 69 - Custom and Optional Signs

DD-1Installing Cable ClampsIMPORTANT: Do not unwrap the ropes until they are securely attached to the charging cable. There are two types of cable cla

Seite 71 - Installing Cable Clamps

E-1ELimited Product WarrantyThis Limited Product Warranty applies to you, a customer who has purchased CHARGEPOINT’s Charging Stations and/or related

Seite 72

E-2ChargePoint® Charging Stationsdefect, in either its original package or packaging providing the Product with a degree of protection equivalent to t

Seite 73 - Limited Product Warranty

E-3 ADDITIONAL INFORMATIONThis Limited Product Warranty is valid for U.S.A. and Canada only.This Limited Product Warranty shall be governed by and con

Seite 76

1692 Dell Ave.Campbell, CA 95008-6901 USAUS toll free: +1-877-370-3802www.chargepoint.com

Seite 77

1-4ChargePoint® Charging StationsDual Circuit Wiring DiagramThe following illustration describes the wiring for installing a CT4000 on a dual circuit.

Seite 78 - US toll free: +1-877-370-3802

1 -5IntroductionSingle Port or Shared Power Wiring DiagramThe following illustration describes the wiring for installing a dual port CT4000 on a share

Kommentare zu diesen Handbüchern

Keine Kommentare